The property had suffered extensive internal damage following a severe storm event. However, the insurer’s appointed surveyor concluded that the damage was not attributable to an insured event, resulting in the claim being declined.
Eco Tiffin were appointed to review the findings, provide an independent expert assessment, and support the client in challenging the insurer’s decision.
The Challenge
The client had already progressed through the insurer’s standard process, including:
- Initial inspection by the insurer’s surveyor
- Formal rejection of the claim
- Escalation via complaint
- Final decision issued maintaining rejection
The insurer’s position was that:
- There was no evidence of storm damage
- The issue was attributed to workmanship or design defects
- The damage could not be linked to a single insured event
This effectively left the client with no route forward, facing substantial repair costs privately.
Our Investigation & Findings
Eco Tiffin carried out a detailed inspection of the property, reviewing both the physical evidence and the insurer’s reports.
Our findings identified that:
- The property had experienced significant water ingress during a known storm event
- Internal damage patterns were consistent with sudden flood-type ingress
- Roof outlets had become blocked with debris during extreme weather conditions
- Water build-up had exceeded drainage capacity, resulting in overflow at perimeter details
- The construction itself was adequate, and not the root cause of failure
We concluded that the original diagnosis was incorrect and that the damage was directly attributable to the storm event.
This distinction was critical. The difference between defective workmanship and storm-induced failure determines whether a claim is valid.
Turning the Claim Around
Eco Tiffin provided formal written evidence to challenge the insurer’s position, clearly setting out:
- Why the original assessment was flawed
- How the sequence of events aligned with storm conditions
- Why the damage should be classified as an insured event
- The technical justification for reinstating the claim
We advised that the claim should be reopened immediately and, if necessary, escalated further with supporting expert evidence.
This stage was pivotal.
By reframing the cause of damage and presenting clear, evidence-based reasoning, the claim moved from rejection to a position where it could be properly reconsidered.
This ultimately enabled the client to proceed with reinstatement under the insurance policy.
Scope of Works Delivered
Following successful progression of the claim, Eco Tiffin were appointed to deliver the full reinstatement works.
The scope included:
- Strip-out and replacement of damaged flooring, including herringbone oak to ground floor
- Repairs to ceilings, plasterwork, and decorations
- Partial removal and reinstatement of kitchen elements
- Specialist repairs to terrazzo flooring
- Full redecoration to a high specification finish
Initial repair costs were assessed in the region of £63,000
With the final coordinated programme of works and associated improvements forming a contract value in excess of £220,000
Works were delivered with full project coordination, ensuring consistency between insurance requirements and high-quality reinstatement.
The Outcome
This project demonstrates the importance of accurate diagnosis in insurance-related building failures.
Where the claim had originally been rejected, Eco Tiffin:
- Identified critical flaws in the insurer’s assessment
- Provided clear technical evidence to support the claim
- Provided costings for all the works
- Enabled the claim to be successfully progressed
- Delivered the full reinstatement works to a high standard
The result was a complete turnaround for the client, transforming a rejected claim into a fully supported insurance-funded project.